Exploring the Garuda Construction and Engineering IPO:



"What You Need to Know"

Garuda Construction and Engineering Limited is set to launch its IPO soon, offering a valuable opportunity for investors. 

The Garuda Construction and Engineering IPO is a book-built issue valued at ₹264.10 crores, combining both a fresh issue and an offer for sale (OFS).

IPO Structure

The total issue includes a fresh issue of 1.83 crore shares, raising ₹173.85 crores, and an OFS of 0.95 crore shares, amounting to ₹90.25 crores. Investors have the chance to subscribe to the IPO from October 8, 2024, to October 10, 2024.

Key IPO Details
  •  Price Band: ₹92 - ₹95 per share
  •  Issue Type: Book Built Issue IPO
  •  Face Value: ₹5 per share
  •  Minimum Lot Size: 157 shares
  •  Minimum Retail Investment: ₹14,915
  •  Listing At: BSE and NSE

Retail investors can invest a minimum amount of ₹14,915 for 157 shares. Small Non-Institutional Investors (sNII) will require a minimum investment of ₹208,810 for 14 lots (2,198 shares), while Big Non-Institutional Investors (bNII) must invest ₹1,014,220 for 68 lots (10,676 shares).

Timeline of Garuda Construction and Engineering IPO

  •  IPO Open Date: October 8, 2024
  •  IPO Close Date: October 10, 2024
  •  Basis of Allotment: October 11, 2024
  •  Refund Initiation: October 14, 2024
  •  Credit of Shares to Demat: October 14, 2024
  •  Listing Date: October 15, 2024

About Garuda Construction and Engineering Limited

Founded in 2010, Garuda Construction and Engineering Limited has built a strong presence in the construction industry, specializing in residential, commercial, infrastructure, and industrial projects. Their portfolio includes operation and maintenance (O&M), mechanical, electrical, and plumbing (MEP) services, as well as finishing works.

Strengths of the Company 

  •  Exclusive Focus: The company primarily focuses on residential and commercial projects but is now expanding into industrial and infrastructure construction. 
  •  Proven Track Record: Notable past projects include Golden Chariot Vasai Hotel & Spa and Golden Chariot Boutique Hotel
  •  Strong Financial Performance: The company's revenue for FY 2024 was ₹15,417.83 lacs, while for FY 2023, it was ₹16,068.76 lacs. 
  •  Increasing Order Book: As of September 28, 2024, the company’s ongoing and pending projects total ₹1,40,827.44 lacs across multiple states.

Financial Overview 

 Garuda Construction and Engineering Limited has demonstrated consistent growth, with assets increasing to ₹234.84 crores as of April 30, 2024. Despite a slight revenue drop, the company's strong balance sheet reflects a healthy financial standing.

Financials Apr 30, 2024 Mar 31, 2024 Mar 31, 2023
Assets (₹ Cr) 234.84 228.49 176.35
Revenue (₹ Cr) 11.88 154.47 161.02
Profit After Tax (₹ Cr) 3.5 36.44 40.8

IPO Objectives 

The funds raised from the Garuda Construction and Engineering IPO will be used for: 

 1. Working Capital Requirements  

2. General Corporate Expenses  

3. Potential Inorganic Acquisitions   

Garuda Construction and Engineering IPO Lot Size 

 Investors can bid for a minimum of 157 shares. The table below shows the minimum and maximum investment options for Retail Investors, S-HNI, and B-HNI categories:

Investor Category Lots Shares Amount (₹)
Retail (Min) 1 157 14,915
Retail (Max) 13 2,041 193,895
S-HNI (Min) 14 2,198 208,810
S-HNI (Max) 67 10,519 999,305
B-HNI (Min) 68 10,676 1,014,220
Why Invest in Garuda Construction and Engineering IPO?

Garuda Construction and Engineering Limited stands out due to its robust business model, financial health, and increasing order book. The company’s proven track record in the construction sector, coupled with a solid balance sheet, provides an attractive investment opportunity. The IPO also offers flexibility in investment sizes, catering to both retail investors and high-net-worth individuals (HNIs).

 With the IPO scheduled to open on October 8, 2024, potential investors should be ready to seize this opportunity by participating before it closes on October 10, 2024

  

Company Contact Details
For more information, investors can reach out to Garuda Construction and Engineering Limited at:

  •  Address: 201, A Wing, Fortune 2000, C-3 Block, Bandra Kurla Complex, Bandra (East), Mumbai 400 051
  •  Phone: +91 22 79635174
  •  Email: compliance@garudaconstructionengineering.com

 Conclusion

 The Garuda Construction and Engineering IPO presents a promising investment opportunity for those looking to invest in a growing construction company. With a proven track record, increasing order book, and solid financials, the company is well-positioned to capitalize on the infrastructure boom in India. Don’t miss the opportunity to invest in this IPO, opening soon from October 8 to October 10, 2024.


Why Choose MBC Trading Platform?

At MBC Trading Platform, we believe in empowering our clients to invest in future-forward industries, such as renewable energy. Whether you’re an experienced investor or just starting, our platform provides you with the tools and insights to make informed decisions. Start investing in India's green energy future today and watch your portfolio grow while contributing to a more sustainable world!

Team MBC
A Professional Stock market analyst & trainer in Rajamahendravaram, Andhra Pradesh.

Launch your GraphyLaunch your Graphy
100K+ creators trust Graphy to teach online
𝕏
MBC TRADING PLATFORM 2024 Privacy policy Terms of use Contact us Refund policy